Day 1. Burying Concrete.

The Buildr's shingle is in place

The builder’s shingle is in place. We’re ready to go.

 

The dust had settled from the demolition and Steve organised for Brad and his father Rob, from Brad Fiori Plumbing to plant the 2 septic tanks, 24m of concrete leach drain and 4 gigantic soak wells on the block.

Rob on the excavator. Brad on the level. Steve on watch.

Rob on the excavator. Brad on the level. Steve on watch.

A section of the leach drain. Rob making sure it goes in straight.

A section of the leach drain. Rob making sure it goes in straight.

Pipe up and backfill.

Pipe up and backfill.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s